Detailed Notes on sir303
In November 1958 it had been taken to the operates at Brighton and was specified an entire rebuild. This included eliminating the air smoothed casing and offering it a complete new condition. The moment its rebuild was done it was returned to its residence drop at Salisbury MPD.For the reason that the first tender had been shed during its time at B